MAJOR PROJECTS OF CCI- SOME SALIENT FEATURES

 

Cable Corporation of India has been in the forefront of Indian Cable Industry. CCI has executed several prestigious projects on land, and sea and in Mountains on Hydro electric projects. 230 KV HYDRO ELECTRIC PROJECTS EXECUTED BY CCI 14 July 1994 Cable Corporation installed and commissioned 2.4 kms of 230kV 500 sqmm XLPE cable for Hydroelectric project in Kadamparai, Tamilnadu.

 

Year 2015-16 - Projects Executed
RINL –VSP VIZAG - 220 kV
Indian Cable Company | Cable Company in India

Design, Manufacture, and Installation of Double circuit, 220KV 500sqmm Copper cond, Al sheath cable. Route length-0.92KM; Cable Qty-5.73Km. Entire project in Steel Plant Vizag, Project consultants- M N Dastur & co. Soak test 24 hours.

 

Commissioned on 10.12.2015

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TPDDL - PRASHANT VIHAR - 66 kV
Indian Cable Company | Cable Company in India

Erection of 66 KV 1000 mm2 Al cond AL sheath cable - 3.72Km Delhi. A view of fencing around terminations and HV cable.

 

Commissioned on 04.12.2015

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FAERY ESTATE-TANTRANSCO - 110 kV
Indian Cable Company | Cable Company in India

Supply and installation of 110KV 630sqmm Aluminium Cond Lead sheath. Route length - 1.015Km; Cable qty - 3.09Km.

 

Commissioned on 30.11.2015

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SML ISUZU - 132 kV
Indian Cable Company | Cable Company in India

Design, manufacture, supply and Installation of 132KV 300sqmm Copper cond Lead sheath cable along with accessories Route length-0.52Km; Cable qty - 2.09Km.

 

Commissioned on 16.09.2015

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BHEL ALAMATHY-TNEB - 230 kV
Indian Cable Company | Cable Company in India

Design, type test, supply, and installation of 230KV 1200sqmm Aluminium Cond Lead sheath. Route length- 3.6Km; Cable Qty - 19.2Km. This had railway crossing, trench less digging in city area of Chennai.

 

Commissioned on 30.08.2015

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PGCIL BOKARO - 220 kV
Indian Cable Company | Cable Company in India

Design, type test, supply, and installation of 220KV 1400sqmm Copper cond, lead sheath cable. Route length-0.4KM; Cable Qty-2.8Km.

 

Commissioned on 24.05.2015

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TNEB GUINDY/KADAPERRY - 230 kV
Indian Cable Company | Cable Company in India

Design, type test, supply, and installation of 230KV 1200sqmm Aluminium Cond Lead sheath. Route length 13.625Km; Cable Qty - 40.875Km.

 

Commissioned on 16.04.2015

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BPCL Submarine Cable - 22 kV
Indian Cable Company | Cable Company in India

Submarine Cable repairing job over. Trenching job under separate PO pending Expected to complete in Jan 16. ITALIAN jointers preparing submarine joint for 22kV XLPE cable.

 

Commissioned on 23.05.2015

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Year 2014-15 - Projects Executed
PGCIL PUDUCHERRY - 110 kV
Indian Cable Company | Cable Company in India

Design, type test, supply, and installation of 110KV 630sqmm Copper Cond Lead sheath. Route length - 6.7Km; Cable qty - 26.8Km. This involved Railway crossing, construction of 2 Bridges over canal.

 

Commissioned on 30.06.2014

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RRVPNL - 132 kV
Indian Cable Company | Cable Company in India

Design, type test, supply, and installation of 132KV 800sqmm Copper cond Al sheath cable. Route length-8.464Km; Cable qty - 34.562Km. This project included HDD, Gas pipe line crossing.

 

Commissioned on 02.04.2014

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TPDDL - MADHUBAN CHOWK - 66 kV
Indian Cable Company | Cable Company in India

Design, Manufacture, type test and installation of 1000sqmm Aluminium Cond Al sheath cable. Route length-2.67Km; Cable Qty- 16.02Km.

 

commissioned on 31.03.2015

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Year 2013-14 - Projects Executed
TNEB ELEPHANTGATE/MYLAPORE - 230 kV
Indian Cable Company | Cable Company in India

Design, type test, supply, and installation supervision of 230KV 1200sqmm Aluminium Cond Lead sheath. Route length 12.225Km; Cable Qty - 36.765Km.

 

Commissioned on 19.10.2013

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TNEB CMRL - 230 kV
Indian Cable Company | Cable Company in India

Design, type test, supply, and installation supervision of 230KV 1200sqmm Aluminium Cond Lead sheath. Route length 3.792 Km; Cable Qty - 22.753 Km.

 

Commissioned on 28.6.2013

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Other Projects Executed
Kadamparai 230KV XLPE CABLES IN A SNAKING ARRANGEMENT IN THE TUNNEL DULY INSTALLED.

Indian Cable Company | Cable Company in IndiaIndian Cable Company | Cable Company in India

14 July 1994 Cable Corporation installed and commissioned 2.4 kms of 230kV 500 sqmm XLPE cable for Hydroelectric project in Kadamparai, Tamilnadu

 

Kadamparai Hydro electric project- This was the first EHV 230kV cable supplied by an Indian company in India. This was followed by Kadamparai stage II, Hydro electric projects. All these projects were undertaken in turnnels under difficultworking condition.

 

TNEB’s underground Hydel Power Plant consists of 4 units of 100 MW each.Power Generated is transferred through 230 kv single core cable of 500 sq mm Aluminium conductor xlpe cables.Cables were Laid in a VERTICAL TUNNEL of 165 mts, and terminated at an overhead sub-station, for onward transmission through overhead lines.The cable length per phase was 730 mts.

 

The job involved terminating cable on transformer with inverted terminations, onto gallery, through the vertical shaft, the verandah and finally to the termination on overhead line connections. Criticality was designing free suspenders along route, grouting & snaking cables through the shaft, & Controlled pulling of cable through the entire route, especially along shaft length.

 

PYKARA 230KV HYDRO ELECTRIC PROJECT
Indian Cable Company | Cable Company in India

230KV XLPE CABLES were laid in inclined shaft for Hydro electric project. A view of Porcelain out door terminations under connection is shown adjacent.

 

The job was similar to kadambarai, except that the shaft was inclined 60 degrees to horizontal.

 

The cable was 230 kv single core 400 sq mm Aluminium and was used to evacuate power generated by three 75 MW units.

 

Nine cables were laid in trefoil in a single inclined shaft.

 

 

 

 

 

GANGA SETU IN BIHAR- PROJECT 132KV FOR PGCIL
Indian Cable Company | Cable Company in India

26 April 2005 Cable Corporation created history again by commissioning 132 kV XLPE cable across River Ganges in Bihar on Mahatma Gandhi Setu. The total route length was 6.774 kms.with 5.2 kms under the bridge.

 

132kV cable 630sqmm corrugated aluminium sheathed cables were laid on a Bridge on River Ganges

 

The cables are laid below the bridge on suspended Hanger Cables were laid on cement wracks below the road on the Ganga Bridge. It was great effort to take the cables from ground to above the bridge and arrange them in trefoil formation. The cables were commissioned in april 2005.

 

The job required lifting of cable to height of 40 mts , laying , dressing , trefoiling of two circuits & all jointing done at that height on hangers barely 1.7 mts width.

 

SUBMARINE CABLES – A CCI SPECIALITY
Indian Cable Company | Cable Company in India

Indian Cable Company | Cable Company in IndiaOn 15th June 1998 Cable Corporation of India created History by laying and commissioning a Submarine cable 4 x 95 sqmm YLyYWW2Y 1.1kv 600 mtrs from main land to Vivekananda rock and 200 mtrs from Vivekananda rock to Tiruvalluvar rock in Indian ocean., in kanyakumari at the congruence of three seas viz Indian ocean, bay of Bengal & Arabian sea.

 

The cables were laid on sea bed and the depths are 3.2 mtrs and 1.5 mtrs. Cables were protected by Heavy duty PVC pipes,RCC Cable sinkers (COVERS) were fixed to keep the cables without movement at 5 meter interval., since the sea is very rough at this location

 

BETDWARAKA SUBMARINE CABLE
Indian Cable Company | Cable Company in India

On 20th Dec 2007 island of Betdwaraka in Gujarat was electrified after turnkey project of cable and Installation under sea of 11kV XLPE cable for a route of 3kms under sea was commissioned. This was a unique project as four single lengths of 3km cable were laid between Okha and Betdwaraka. As sea in this place is a Gulf, the sea currents were very strong. Power supplied to the island brought relief to devotees and residents of this island which is a main tourist pilgrimage centre.

 

The job involved survey of sea bed , evaluating the route , study of tidal patterns, the right time for the cable laying etc. Before the laying of cable under sea, bet dwaraka was , getting power supply from diesel generators, installed at the island. The fuel was carried to the island everyday at high costs..and was very inadequate to the needs of the island leading to power cuts, unstabilised power etc. With the availability of power the government is considering establishment of a residential university, and establish small industries catering to needs of the island.

 

Cable Corporation of India has several Aerial Bunched cable Projects to its credit.One such client is Jayashree Textiles , Rishra Calcutta. Supplied 3 x 185 sqmm, 33 kV XLPE 1.9 Km Double circuit , AB cables, joints , terminations &hardwares. Installation of AB Cables , testing & commissioning.

 

City Transmission / Distribution Systems

CCI has been at the forefront of city upgradation systems.

 

The very early upgradation in Karnataka & Kerala with 66 kv cable systems were designed , supplied , erected & commissioned by CCI.

 

Similarly early 110kv systems at Tamil Nadu were executed by CCI.

 

Presently Cable Corporation is executing 132 kilometers of 1200 sqmm 230kV cable project for TNEB in Chennai city. being part of Master Plan for the expansion of power supply system to cater to the growth in demand, to minimize the distribution losses and to improve the system reliability in the Chennai Metropolitan AreaCable Corporation has received another prestigious order from TNEB for 129 kilometers 230 kv cables , a turnkey project., being part of the above scheme.

 

The above have contributed in Cable corporation executing a number of projects over last 25 years and has more than 350kms of EHV cable to its credit., and executing 200 kms presently.

 